Q01
How far can we oversubscribe power?
Rack, row and hall draw simulated against breaker, UPS and utility limits per failure domain; the capping policy sized so critical jobs are rarely touched.
Reported asρ at P[cap on critical] ≤ ε · stranded MW
Engagements
Each size applies the same model of the software–hardware stack and its uncertainties, and the same optimiser, at a different depth: a fast risk scan of a design already on the table, a full optimisation study of what to build, or an ongoing scenario simulation as plans change. All three are simulation work on design documents and inputs you send. Fixed scope and fixed fee, agreed before work starts.
The flow
The design basis, drawings, equipment list and the decision you face. We do not connect to your systems.
The stack and its uncertainties go into one model. A large-scale optimiser returns the points that match your risk profile.
Expected cost, tail risk and a recommendation, with the auditable model handed over.
What you get
Same model, different depth. Durations are indicative and fixed at scoping. No access to your systems at any size: design documents and inputs only.
| T1Fast risk scan | T2Full optimisation study | T3Ongoing scenario simulation | |
|---|---|---|---|
| Question answered | Is this design safe to build? | What should we build? | Is the plan still optimal after the latest changes? |
| You get |
|
|
|
| Outcome | A go / change decision on the current design, with its tail risk stated. | One concept, defended on expected cost and tail risk, ready for detailed design. | Expansion, refresh and sourcing decisions re-tested by simulation each time the inputs change. |
| Access to your systems | None: design documents only | None: design documents only | None: simulation on inputs you send |
| Indicative duration | ≈ 4 weeks | ≈ 8–12 weeks | Ongoing · periodic |
| Typical next step | A full optimisation study, or detailed design | Detailed design, then ongoing scenario simulation | The next scheduled re-run |
T3 is simulation only: we re-run the model on the updated documents and inputs you send.
Method
The same five steps at every tier; the depth changes, not the discipline.
01
The decision, the options on the table, and the risk budget (α, ε) and acceptance criteria, agreed with you.
OutputDecision brief
02
Workload, servers, racks, power chain, cooling plant and supply chain as one parameterised model, built from your design basis.
OutputSystem model
03
Distributions for load growth, accelerator power, climate, failures, prices and lead times, fitted to your data, vendor data and published field data.
OutputAssumption register
04
Monte Carlo and reliability models; chance-constrained and two-stage stochastic programs; the risk–cost frontier and its sensitivities.
OutputFrontier and sensitivities
05
A recommendation with its expected cost and tail risk, and the documented model, so your team can audit and re-run every number.
OutputDecision memo and model
The model
Density sets cooling; cooling sets the power path; the power path sets what you can buy, and when. We decide them together.
What you get
Options compared on expected cost and tail risk under the same scenarios, with the probability of each failure mode stated, not implied.
Illustrative
Synthetic numbers to show the format of a result. Not from any client or project. Risk budget: εT = 2% per year, α = 0.95.
| Option | Cooling · power path | E[TCO / GPU-h] index | CVaR0.95 index | P[thermal excursion] / yr | P(energised by target) | Reading |
|---|---|---|---|---|---|---|
| A | Direct-to-chip, W32 · AC, 2N | 100 | 112 | 0.8% | 0.71 | Safe, but reserve power is stranded |
| B | Direct-to-chip, W40 · shared reserve + capping | 94 | 103 | 1.9% | 0.78 | Recommended. Lowest cost and tail within ε |
| C | Two-phase immersion, W40 · AC, 2N | 97 | 121 | 0.6% | 0.52 | Best thermal margin; fluid and supply tail |
Index: option A = 100. Lower is better for cost and CVaR. Every number in a real report traces to the assumption register.
Sets the date most often:
T1≈ 4 weeks
Your planned AI hall, scored for tail risk before you build.
Owners, developers and operators with a design basis or a reference design they are about to commit capital to.
CVaRα[TCO] · P[thermal excursion] · P[power cap] · P[late delivery]
OutcomeA go / change decision on the current design, with its tail risk stated.
Illustrated byUC 05 · Cooling under-provisioning UC 06 · Environment and reliability
T2≈ 8–12 weeks
The software–hardware stack, jointly optimised under your risk profile.
Teams choosing a concept for a new hall or generation: density, cooling technology (incl. immersion), power path, W-class.
E[TCO] · CVaRα · chance constraints εT, εP, εW, εS
OutcomeOne concept, defended on expected cost and tail risk, ready for detailed design.
Illustrated byUC 01 · Two-phase immersion (2PIC) UC 03 · Stranded redundant power UC 07 · Life-cycle impact of cooling
T3Ongoing · periodic
The same model, re-run when plans, hardware or suppliers change. Simulation only.
Owners and operators with a phased build-out or refresh roadmap, whose plans, hardware and suppliers keep changing.
P50 / P90 / P99 capacity per phase · Δ E[TCO] and Δ CVaRα vs last run · P[late delivery]
OutcomeExpansion, refresh and sourcing decisions re-tested by simulation each time the inputs change.
Illustrated byUC 02 · Cooling technology selection UC 04 · Power oversubscription
Decisions we price
Each is a joint question across software, servers, power, cooling and supply. Each comes back as an expected value, a tail and a recommendation.
Q01
Rack, row and hall draw simulated against breaker, UPS and utility limits per failure domain; the capping policy sized so critical jobs are rarely touched.
Reported asρ at P[cap on critical] ≤ ε · stranded MW
Q02
Each option scored on sustained clocks, facility-water class, fluid and supply risk, and cost, not on peak TDP.
Reported asE[TCO / GPU-h] · CVaRα · P[thermal excursion]
Q03
Transformer, switchgear, generator and CDU lead times as distributions, propagated through the build schedule.
Reported asP(energised by date) · critical-path items
Q04
Interconnect capacity, phased energisation and on-site options traded against the compute ramp you need.
Reported asMW-months of deferred compute · E[TCO]
Q05
Job-level swings simulated against UPS, BESS and utility ramp limits; power floors, staggered checkpoints and storage sized together.
Reported asdP/dt at P99 · storage kWh · throughput cost
Q06
Availability model with failure distributions, MTTR and spare pools per failure domain: N+1, 2N, or reserve shared with workload shedding.
Reported asP[SLA breach] · spares per pod · stranded power
Q07
The joint distribution of IT load and weather, rather than their stacked maxima, sets plant capacity.
Reported asP50 / P90 / P99 heat load · capacity at ε
Q08
Economiser hours and chiller trim traded against junction-temperature margin and leakage at the cold plate.
Reported asHours at limit per year · Δ E[TCO]
Q09
TCO under uncertainty: energy, water, failures, capping, delivery delay and refresh, in one model.
Reported asDistribution of TCO / GPU-h · CVaRα
Numbers 01–04 refer to the practice areas on this page. UC links go to published work on the same question.
What the model covers
Every engagement draws on all four.
01Optimiser

Placement, capping, clock and checkpoint policies are simulated against UPS headroom, CDU and facility-water capacity, and thermal ride-through, then optimised with the plant. Stranded watts become capacity; training swings are shaped in the design.
02Model

Growth, accelerator power, climate, failures, prices and delivery dates are distributions. We build Monte Carlo and reliability models and solve chance-constrained, two-stage programs over them.
03Driven by the model

Concepts for 100 to ~600 kW racks. Cold plate or two-phase immersion (2PIC), AC or 800 VDC, W-class: each option is parameterised and traded on expected cost and tail risk.
04Feeds the model

Long-lead equipment now sets the schedule. Lead times, sourcing concentration and regulatory exposure (e.g. PFAS fluids) become distributions, so every design choice carries its delivery risk.
FAQ
We discuss the decision, the scale and the binding constraints, and agree the questions the model would answer and the inputs it needs. Afterwards you receive a scoping note with the recommended engagement and a fixed scope and fee.
A scheduled re-run of the same model whenever your plans, hardware generations or supplier quotes change. You send updated inputs; we re-simulate, re-optimise and report what changed and why. It is simulation only: we do not connect to, operate or control any of your systems.
For a fast risk scan: the design basis (IT load, platform, rack density, phasing), single-line and heat-rejection concepts, site climate and utility constraints, and the equipment list with quoted lead times. Where data is missing we use published field data and record the assumption.
A fixed fee for a fixed scope, set out in the scoping note and agreed before any work starts.
No. We work at concept and decision level and hand over acceptance criteria for detailed design. Detailed design, sign-off and construction stay with your design and delivery partners.
Yes. Engagements run under NDA. We need design-level documents, not access to production systems.
The decision memo, the assumption register and the documented simulation model, so your engineers can audit every number and re-run it.
No. The same model applies to retrofits such as adding liquid cooling to an air-cooled hall, to hardware refresh cycles and to phased expansions.
Engineering is based in Zürich; the company is registered in Ireland. Work is run remotely, with site visits where the scope needs them.
Send the design basis and the decision you face. We recommend one in the scoping note.