Why now

The binding constraints are power, dates and density.

> 4 years

Average grid-connection lead time for a new 50 MW data center in primary markets; about 7 years in Northern Virginia.

JLL, 2026 Global Data Center Outlook

128 weeks

Average US lead time for a power transformer, Q2 2025. Switchgear: 44 weeks.

Wood Mackenzie, Oct 2025

Over half

Of data center projects faced delays in 2025. Delivery dates now need buffers.

JLL, 2026 Global Data Center Outlook

30 kW vs 170 kW

More than 80% of operators have no rack above 30 kW. Next-generation liquid-cooled racks exceed 170 kW.

Uptime Institute, Global Data Center Survey 2025 · Meta Engineering, Prometheus, Oct 2026

Market figures from the cited sources. Not Hermitian results.

Investors and lenders

Underwrite the capacity, the date and the tail, not only the base case.

An AI financing underwrites capacity that does not exist yet: an energisation date, a power envelope, a cooling design and the accelerators that depend on them. We turn data-room documents into probabilities your committee can price.

Book a scoping callFast risk scan →

Substation transformer, Muurame, Finland.
Substation transformer, Muurame, Finland. Photo: Antti Leppänen, CC BY 4.0, via Wikimedia Commons; converted to greyscale.

Questions we answer

  1. Does the IT capacity the site can actually deliver match the capacity in the financial model, after redundancy, cooling derates and phasing?
  2. What is the probability of energisation by the date the model assumes, given interconnection and long-lead equipment?
  3. What do cost and delay look like at P90 and in the tail, not only at P50?
  4. Can the facility host the next accelerator generation without rework, or is it a one-generation asset?
  5. Is the availability the offtake contract assumes consistent with failure and repair rates for this hardware?

You receive

  • Technical risk memo for the credit or investment committee
  • P(energised by date), P[capacity shortfall] and tail cost, per scenario
  • Assumption register traced to data-room documents
  • Findings framed so your advisers can turn them into conditions or covenants

Engagement

Fast risk scan, scoped to the deal timeline.

We work from documents. We do not certify construction milestones or witness acceptance tests; those stay with your independent engineer.

ContextJLL, 2026 Global Data Center Outlook · Wood Mackenzie, Oct 2025

Neoclouds, GPU clouds and AI labs

Revenue is goodput. Design the cluster for it.

Large synchronous jobs stop when one host fails, so failure domains, spares, checkpointing, power swings and cooling headroom set how many GPU-hours you can sell or use. We simulate them together for the cluster you are about to build.

Book a scoping callFull optimisation study →

Cray XE6 cabinets, Blue Waters supercomputer, NCSA.
Cray XE6 cabinets, Blue Waters supercomputer, NCSA. Photo: Stevek ncsa, CC BY-SA 3.0, via Wikimedia Commons; converted to greyscale.

Questions we answer

  1. How much goodput does a cluster design lose to failures, restarts, checkpoints, caps and throttling?
  2. How many hot spares per NVL72-class rack and per pod, and where do the failure domains sit?
  3. Can UPS, storage and the utility absorb synchronous training power swings, and at what cost?
  4. Will today's hall take the next generation of 170 kW+ racks, or does it strand power and cooling?
  5. What SLA can the design support, and what is the expected credit exposure?

You receive

  • Goodput model per cluster design, with sensitivities
  • Spares and failure-domain sizing
  • Training power-shaping specification
  • Density-migration concept for the next generation

Engagement

Full optimisation study, then ongoing scenario simulation as hardware generations change.

Simulation on your design and hardware plans. We do not operate or connect to your clusters.

ContextMeta Engineering, Prometheus, Oct 2026 · Llama 3 Herd of Models, §3.3.4, arXiv:2407.21783

Developers and colocation

A defensible date for time to power, and a design basis tenants will take.

Power and delivery dates now decide site selection and leasing. Tenant densities are uncertain and climbing. We size phasing, storage, on-site options and procurement against the distribution of both.

Book a scoping callFast risk scan →

Questions we answer

  1. What is the probability of energising each phase on time, and which items sit on the critical path?
  2. Phase the load, add storage or bridge with on-site generation: which wins on cost and risk?
  3. Which design basis takes 100 kW+ liquid-cooled tenants without stranding capacity if they come in lower?
  4. Which long-lead items to release early, and where a second source pays for itself?

You receive

  • Schedule-risk simulation: P(energised by date) per phase
  • Phasing, storage and on-site power options on one risk–cost frontier
  • Flexible design basis across tenant densities and W-classes
  • Procurement inputs: early releases, buffers, substitution

Engagement

Fast risk scan on the current plan, or a full optimisation study for a new campus.

ContextJLL, 2026 Global Data Center Outlook · CBRE, North America Data Center Trends H1 2025

Hyperscalers

Fleet-scale policies, priced on risk.

At fleet scale, small policy changes in oversubscription, redundancy and cooling provisioning move gigawatts. These are the questions the use cases on this site address directly.

Book a scoping callFull optimisation study →

Questions we answer

  1. How far can power be oversubscribed per failure domain, with what capping risk to critical workloads?
  2. Can reserve power be shared with workload shedding instead of sitting idle?
  3. Can cooling be provisioned below the coincident peak of load and weather?
  4. Which next-generation hall concept wins on expected cost and tail risk?

You receive

  • Policy simulations per failure domain
  • Next-generation hall concept on a risk–cost frontier
  • Decision memo and documented model

Engagement

Full optimisation study, then ongoing scenario simulation for the roadmap.

Published workUC 04 · UC 03 · UC 05

Start with a scoping call.

Bring one decision. You leave with the questions the model would answer, the inputs it needs and a fixed scope.